1st Floor

Enter in Square Feet which is Length X Width total area on 1st floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 1st floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 1st floor. These areas often are open on three sides. Includes footer, porch slab, post, heta straps, soffit board ceiling, floor truss above, labor
Covered porch Square Feet
Enter in feet the total distance of all exterior walls on 1st floor including any exterior stair walls, house walls, garage wall, etc. Note: that the ceiling height below must be filled out to be correct.
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 1st floor. For multiple heights just average together. Note: The number is used in the above exterior wall calculations. Includes CMU Block, Stucco
Ceiling height in Feet

2nd Floor

Enter in Square Feet which is Length X Width total area on 2nd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 2nd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 2nd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

3rd Floor

Enter in Square Feet which is Length X Width total area on 3rd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 3rd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 3rd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

Exterior Windows & Doors

Don't just count the openings, multiple windows fit together and you count each window. Included Impact rated windows, Mull bars, Screws, Header, metal straps, cripple studs, corner bead, Labor.
Total number of Windows
Includes, Impact rated door slab swing doors, paint, door knob, stop, header, door frame and all labor.
Total number of Swing Doors (Solid)
Covers, Impact rated glass swing doors, paint, door knob hardware, door frame and all labor.
Total number of Swing Doors (Glass)
Sidelight is the small narrow window that mounts to the side of a swing door. includes impact rated window, header and labor, paint.
Total number of Door Sidelights
These are the 8' tall glass sliding door panel. At each opening you will have 2 or more panels, count. Includes Impact rated panels, Labor, Hardware and Header.
Total number of Patio Slider Panels
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 16x7
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 8x7

Cabinets & Plumbing

Includes lower and upper cabinets, Granite Countertop, Handles, GFCI outlets, labor.
Kitchen Cabinets linear feet
Includes Vanity cabinets, Granite Countertop w/ splash, Handles, Mirror, Light fixture, GFCI outlets, labor.
Bathroom Cabinets linear feet
Includes Stainless Steel under mount sink, Plumbing rough-ins, Sink faucet.
Sinks- Kitchen / Bar / Utility
Includes China under mount sink, Plumbing Rough-in, Plumbing Fixture, one light fixture wired.
Sinks- Bathroom Only
Includes Plumbing rough-in, Toilet fixture, Exhaust fan, Switch, labor.
Toilets
Includes tile, plumbing rough-in, Shower pan, water proofing, plumbing fixtures, Shower Rod.
Showers
Includes tile, plumbing rough-in, tub, plumbing fixtures, Shower Rod, labor.
Tub / Shower Combo
Includes, jetted tub, faucets, up size water heater, 220 gfci power, tile splash, Labor.
Large Tub

Roof / Railing / Other

Includes concrete driveway 4" thick, grading, forms, Labor & Materials.
Driveway Square Feet
Includes aluminum post & Picket railings, labor, material.
Railing Linear Feet
Includes Trusses, Shingle, 1/2 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof– Sloped Square Feet
Includes Trusses, TPO, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Flat Square Feet
Includes Trusses 16" O.C., Polyurethane coating, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Sundeck Square Feet
Extra Field, if used quantity equals $1 and details explained in Notes.
Other
Price estimator To
03/23/2023https://gasthomes.com/new plan
This pricing estimator is only a rough range based on averages that a normal house could be built, the more accurate you enter data the more accurate the price will be.
Disclaimer
The goal was to put numbers together that would build a quality normal complete house except for the building lot, exterior pool, landscape and appliances.
Not Included

Additional Upgrades & Add-on Options

Impact fees are charged by cities to help cover the load on the cities infrastructure when a house is added. Each cities fees are different, and if a past house was on the lot the fees are often highly reduced or even zero.
Impact Fees
Soil testing is often done before you buy your lot to confirm a possible foundation type that is allowed. Often you test two spots on lot about 25' to 35' deep, and is required by the building department.
Soil Testing by Engineer
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: -Under 2,000 Sq Ft
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: - Over 2,000 Sq Ft
Not always required (Soil Report to confirm) but based off your info added this is a fair range that includes pilings every 12' at footer, 35' deep, cut off and remove exposed with monitored, certified and vibration analyses
Foundation Pilings
Based off your info above this is the price extra to replace Laminate shingles with Aluminum .032 hidden screw standing seam metal roof.
Laminate Shingle to Metal Roof
Based on your info, Replace Post and Picket aluminum railing with Aluminum post and horizontal Stainless Steel Cable railing.
Reg. Railing upgraded to S.S. Cable
Based on your driveway data, replace 4" thick concrete with Pavers & 3" base material.
Driveway upgrade to Pavers
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 2 stops (1st & 2nd Flr)
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 3 stops (1,2 & 3rd Flr)
Based on your data, Credit stucco on CMU and replaced with 6" cement siding.
Stucco upgraded to cement siding: -1st floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: -2nd Floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: - 3rd Floor
All Gast Homes houses have CMU concrete block on first floor standard.
Exterior Walls CMU Concrete Block: -1st floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 2nd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: -2nd Floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 3rd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: - 3rd Floor
Replace CMU with ICF solid concrete core, rebar, double sided stucco, labor
Exterior Walls ICF Solid Concrete: -1st floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: -2nd Floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: - 3rd Floor

this is the admin calacator

1st Floor

Enter in Square Feet which is Length X Width total area on 1st floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 1st floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 1st floor. These areas often are open on three sides. Includes footer, porch slab, post, heta straps, soffit board ceiling, floor truss above, labor
Covered porch Square Feet
Enter in feet the total distance of all exterior walls on 1st floor including any exterior stair walls, house walls, garage wall, etc. Note: that the ceiling height below must be filled out to be correct.
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 1st floor. For multiple heights just average together. Note: The number is used in the above exterior wall calculations. Includes CMU Block, Stucco
Ceiling height in Feet

2nd Floor

Enter in Square Feet which is Length X Width total area on 2nd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 2nd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 2nd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

3rd Floor

Enter in Square Feet which is Length X Width total area on 3rd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 3rd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 3rd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

Exterior Windows & Doors

Don't just count the openings, multiple windows fit together and you count each window. Included Impact rated windows, Mull bars, Screws, Header, metal straps, cripple studs, corner bead, Labor.
Total number of Windows
Includes, Impact rated door slab swing doors, paint, door knob, stop, header, door frame and all labor.
Total number of Swing Doors (Solid)
Covers, Impact rated glass swing doors, paint, door knob hardware, door frame and all labor.
Total number of Swing Doors (Glass)
Sidelight is the small narrow window that mounts to the side of a swing door. includes impact rated window, header and labor, paint.
Total number of Door Sidelights
These are the 8' tall glass sliding door panel. At each opening you will have 2 or more panels, count. Includes Impact rated panels, Labor, Hardware and Header.
Total number of Patio Slider Panels
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 16x7
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 8x7

Cabinets & Plumbing

Includes lower and upper cabinets, Granite Countertop, Handles, GFCI outlets, labor.
Kitchen Cabinets linear feet
Includes Vanity cabinets, Granite Countertop w/ splash, Handles, Mirror, Light fixture, GFCI outlets, labor.
Bathroom Cabinets linear feet
Includes Stainless Steel under mount sink, Plumbing rough-ins, Sink faucet.
Sinks- Kitchen / Bar / Utility
Includes China under mount sink, Plumbing Rough-in, Plumbing Fixture, one light fixture wired.
Sinks- Bathroom Only
Includes Plumbing rough-in, Toilet fixture, Exhaust fan, Switch, labor.
Toilets
Includes tile, plumbing rough-in, Shower pan, water proofing, plumbing fixtures, Shower Rod.
Showers
Includes tile, plumbing rough-in, tub, plumbing fixtures, Shower Rod, labor.
Tub / Shower Combo
Includes, jetted tub, faucets, up size water heater, 220 gfci power, tile splash, Labor.
Large Tub

Roof / Railing / Other

Includes concrete driveway 4" thick, grading, forms, Labor & Materials.
Driveway Square Feet
Includes aluminum post & Picket railings, labor, material.
Railing Linear Feet
Includes Trusses, Shingle, 1/2 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof– Sloped Square Feet
Includes Trusses, TPO, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Flat Square Feet
Includes Trusses 16" O.C., Polyurethane coating, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Sundeck Square Feet
Extra Field, if used quantity equals $1 and details explained in Notes.
Other
Price estimator To
2/24/2023https://gasthomes.com/Custom plan
This pricing estimator is only a rough range based on averages that a normal house could be built, the more accurate you enter data the more accurate the price will be.
Disclaimer
The goal was to put numbers together that would build a quality normal complete house except for the building lot, exterior pool, landscape and appliances.
Not Included

Additional Upgrades & Add-on Options

Impact fees are charged by cities to help cover the load on the cities infrastructure when a house is added. Each cities fees are different, and if a past house was on the lot the fees are often highly reduced or even zero.
Impact Fees
Soil testing is often done before you buy your lot to confirm a possible foundation type that is allowed. Often you test two spots on lot about 25' to 35' deep, and is required by the building department.
Soil Testing by Engineer
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: -Under 2,000 Sq Ft
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: - Over 2,000 Sq Ft
Not always required (Soil Report to confirm) but based off your info added this is a fair range that includes pilings every 12' at footer, 35' deep, cut off and remove exposed with monitored, certified and vibration analyses
Foundation Pilings
Based off your info above this is the price extra to replace Laminate shingles with Aluminum .032 hidden screw standing seam metal roof.
Laminate Shingle to Metal Roof
Based on your info, Replace Post and Picket aluminum railing with Aluminum post and horizontal Stainless Steel Cable railing.
Reg. Railing upgraded to S.S. Cable
Based on your driveway data, replace 4" thick concrete with Pavers & 3" base material.
Driveway upgrade to Pavers
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 2 stops (1st & 2nd Flr)
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 3 stops (1,2 & 3rd Flr)
Based on your data, Credit stucco on CMU and replaced with 6" cement siding.
Stucco upgraded to cement siding: -1st floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: -2nd Floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: - 3rd Floor
All Gast Homes houses have CMU concrete block on first floor standard.
Exterior Walls CMU Concrete Block: -1st floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 2nd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: -2nd Floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 3rd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: - 3rd Floor
Replace CMU with ICF solid concrete core, rebar, double sided stucco, labor
Exterior Walls ICF Solid Concrete: -1st floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: -2nd Floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: - 3rd Floor

$899,612.96 to $1,009,565.66

Info Box

info box module with price range pasted in the title pre fix

This IS the pasted short code of the saved file from the range above

1st Floor

Enter in Square Feet which is Length X Width total area on 1st floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 1st floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 1st floor. These areas often are open on three sides. Includes footer, porch slab, post, heta straps, soffit board ceiling, floor truss above, labor
Covered porch Square Feet
Enter in feet the total distance of all exterior walls on 1st floor including any exterior stair walls, house walls, garage wall, etc. Note: that the ceiling height below must be filled out to be correct.
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 1st floor. For multiple heights just average together. Note: The number is used in the above exterior wall calculations. Includes CMU Block, Stucco
Ceiling height in Feet

2nd Floor

Enter in Square Feet which is Length X Width total area on 2nd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 2nd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 2nd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

3rd Floor

Enter in Square Feet which is Length X Width total area on 3rd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 3rd floor exist then leave this section with blanks or zero's.
Living / Condition Square Feet
Enter in Square feet which is Length x Width of area that is not finished on 3rd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled.
Unconditioned Square Feet
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above.
Porch Square Feet
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco
Linear feet of exterior wall
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor
Ceiling height in Feet

Exterior Windows & Doors

Don't just count the openings, multiple windows fit together and you count each window. Included Impact rated windows, Mull bars, Screws, Header, metal straps, cripple studs, corner bead, Labor.
Total number of Windows
Includes, Impact rated door slab swing doors, paint, door knob, stop, header, door frame and all labor.
Total number of Swing Doors (Solid)
Covers, Impact rated glass swing doors, paint, door knob hardware, door frame and all labor.
Total number of Swing Doors (Glass)
Sidelight is the small narrow window that mounts to the side of a swing door. includes impact rated window, header and labor, paint.
Total number of Door Sidelights
These are the 8' tall glass sliding door panel. At each opening you will have 2 or more panels, count. Includes Impact rated panels, Labor, Hardware and Header.
Total number of Patio Slider Panels
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 16x7
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor.
Overhead Garage Door 8x7

Cabinets & Plumbing

Includes lower and upper cabinets, Granite Countertop, Handles, GFCI outlets, labor.
Kitchen Cabinets linear feet
Includes Vanity cabinets, Granite Countertop w/ splash, Handles, Mirror, Light fixture, GFCI outlets, labor.
Bathroom Cabinets linear feet
Includes Stainless Steel under mount sink, Plumbing rough-ins, Sink faucet.
Sinks- Kitchen / Bar / Utility
Includes China under mount sink, Plumbing Rough-in, Plumbing Fixture, one light fixture wired.
Sinks- Bathroom Only
Includes Plumbing rough-in, Toilet fixture, Exhaust fan, Switch, labor.
Toilets
Includes tile, plumbing rough-in, Shower pan, water proofing, plumbing fixtures, Shower Rod.
Showers
Includes tile, plumbing rough-in, tub, plumbing fixtures, Shower Rod, labor.
Tub / Shower Combo
Includes, jetted tub, faucets, up size water heater, 220 gfci power, tile splash, Labor.
Large Tub

Roof / Railing / Other

Includes concrete driveway 4" thick, grading, forms, Labor & Materials.
Driveway Square Feet
Includes aluminum post & Picket railings, labor, material.
Railing Linear Feet
Includes Trusses, Shingle, 1/2 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof– Sloped Square Feet
Includes Trusses, TPO, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Flat Square Feet
Includes Trusses 16" O.C., Polyurethane coating, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor
Roof—Sundeck Square Feet
Extra Field, if used quantity equals $1 and details explained in Notes.
Other
Price estimator To
03/23/2023https://gasthomes.com/Price Estimator Trial Run Master plan
This pricing estimator is only a rough range based on averages that a normal house could be built, the more accurate you enter data the more accurate the price will be.
Disclaimer
The goal was to put numbers together that would build a normal complete house except for the building lot, exterior pool, landscape and appliances.
Not Included

Additional Upgrades & Add-on Options

Impact fees are charged by cities to help cover the load on the cities infrastructure when a house is added. Each cities fees are different, and if a past house was on the lot the fees are often highly reduced or even zero.
Impact Fees
Soil testing is often done before you buy your lot to confirm a possible foundation type that is allowed. Often you test two spots on lot about 25' to 35' deep, and is required by the building department.
Soil Testing by Engineer
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: -Under 2,000 Sq Ft
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house.
Demo Existing Home: - Over 2,000 Sq Ft
Not always required (Soil Report to confirm) but based off your info added this is a fair range that includes pilings every 12' at footer, 35' deep, cut off and remove exposed with monitored, certified and vibration analyses
Foundation Pilings
Based off your info above this is the price extra to replace Laminate shingles with Aluminum .032 hidden screw standing seam metal roof.
Laminate Shingle to Metal Roof
Based on your info, Replace Post and Picket aluminum railing with Aluminum post and horizontal Stainless Steel Cable railing.
Reg. Railing upgraded to S.S. Cable
Based on your driveway data, replace 4" thick concrete with Pavers & 3" base material.
Driveway upgrade to Pavers
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 2 stops (1st & 2nd Flr)
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light.
Elevator: - 3 stops (1,2 & 3rd Flr)
Based on your data, Credit stucco on CMU and replaced with 6" cement siding.
Stucco upgraded to cement siding: -1st floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: -2nd Floor
Based on your data, Credit stucco on wood and replaced with 6" cement siding.
Stucco upgraded to cement siding: - 3rd Floor
All Gast Homes houses have CMU concrete block on first floor standard.
Exterior Walls CMU Concrete Block: -1st floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 2nd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: -2nd Floor
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 3rd flr, trusses, bolts , 1x2 furring, insulation, stucco.
Exterior Walls CMU Concrete Block: - 3rd Floor
Replace CMU with ICF solid concrete core, rebar, double sided stucco, labor
Exterior Walls ICF Solid Concrete: -1st floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: -2nd Floor
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor
Exterior Walls ICF Solid Concrete: - 3rd Floor