test plan name
Price range:
$1,704,932.42 to $1,704,932.42
1st Floor
Enter in Square Feet which is Length X Width total area on 1st floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. |
Living / Condition Square Feet | ||
Enter in Square feet which is Length x Width of area that is not finished on 1st floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. |
Unconditioned Square Feet | ||
Enter square feet which is width x length for covered porch areas on 1st floor. These areas often are open on three sides. Includes footer, porch slab, post, heta straps, soffit board ceiling, floor truss above, labor |
Covered porch Square Feet | ||
Enter in feet the total distance of all exterior walls on 1st floor including any exterior stair walls, house walls, garage wall, etc. Note: that the ceiling height below must be filled out to be correct. |
Linear feet of exterior wall | ||
Enter in Feet the height from floor to ceiling on 1st floor. For multiple heights just average together. Note: The number is used in the above exterior wall calculations. Includes CMU Block, Stucco |
Ceiling height in Feet |
2nd Floor
Enter in Square Feet which is Length X Width total area on 2nd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 2nd floor exist then leave this section with blanks or zero's. |
Living / Condition Square Feet | ||
Enter in Square feet which is Length x Width of area that is not finished on 2nd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. |
Unconditioned Square Feet | ||
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above. |
Porch Square Feet | ||
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco |
Linear feet of exterior wall | ||
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor |
Ceiling height in Feet |
3rd Floor
Enter in Square Feet which is Length X Width total area on 3rd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 3rd floor exist then leave this section with blanks or zero's. |
Living / Condition Square Feet | ||
Enter in Square feet which is Length x Width of area that is not finished on 3rd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. |
Unconditioned Square Feet | ||
Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above. |
Porch Square Feet | ||
Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco |
Linear feet of exterior wall | ||
Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor |
Ceiling height in Feet |
Exterior Windows & Doors
Don't just count the openings, multiple windows fit together and you count each window. Included Impact rated windows, Mull bars, Screws, Header, metal straps, cripple studs, corner bead, Labor. |
Total number of Windows | ||
Includes, Impact rated door slab swing doors, paint, door knob, stop, header, door frame and all labor. |
Total number of Swing Doors (Solid) | ||
Covers, Impact rated glass swing doors, paint, door knob hardware, door frame and all labor. |
Total number of Swing Doors (Glass) | ||
Sidelight is the small narrow window that mounts to the side of a swing door. includes impact rated window, header and labor, paint. |
Total number of Door Sidelights | ||
These are the 8' tall glass sliding door panel. At each opening you will have 2 or more panels, count. Includes Impact rated panels, Labor, Hardware and Header. |
Total number of Patio Slider Panels | ||
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor. |
Overhead Garage Door 16x7 | ||
Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor. |
Overhead Garage Door 8x7 |
Cabinets & Plumbing
Includes lower and upper cabinets, Granite Countertop, Handles, GFCI outlets, labor. |
Kitchen Cabinets linear feet | ||
Includes Vanity cabinets, Granite Countertop w/ splash, Handles, Mirror, Light fixture, GFCI outlets, labor. |
Bathroom Cabinets linear feet | ||
Includes Stainless Steel under mount sink, Plumbing rough-ins, Sink faucet. |
Sinks- Kitchen / Bar / Utility | ||
Includes China under mount sink, Plumbing Rough-in, Plumbing Fixture, one light fixture wired. |
Sinks- Bathroom Only | ||
Includes Plumbing rough-in, Toilet fixture, Exhaust fan, Switch, labor. |
Toilets | ||
Includes tile, plumbing rough-in, Shower pan, water proofing, plumbing fixtures, Shower Rod. |
Showers | ||
Includes tile, plumbing rough-in, tub, plumbing fixtures, Shower Rod, labor. |
Tub / Shower Combo | ||
Includes, jetted tub, faucets, up size water heater, 220 gfci power, tile splash, Labor. |
Large Tub |
Roof / Railing / Other
Includes concrete driveway 4" thick, grading, forms, Labor & Materials. |
Driveway Square Feet | ||
Includes aluminum post & Picket railings, labor, material. |
Railing Linear Feet | ||
Includes Trusses, Shingle, 1/2 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor |
Roof– Sloped Square Feet | ||
Includes Trusses, TPO, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor |
Roof—Flat Square Feet | ||
Includes Trusses 16" O.C., Polyurethane coating, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor |
Roof—Sundeck Square Feet | ||
Extra Field, if used quantity equals $1 and details explained in Notes. |
Other |
Price estimator To
03/22/2023https://gasthomes.com/test plan name
Additional Upgrades & Add-on Options
Impact fees are charged by cities to help cover the load on the cities infrastructure when a house is added. Each cities fees are different, and if a past house was on the lot the fees are often highly reduced or even zero. |
Impact Fees | ||
Soil testing is often done before you buy your lot to confirm a possible foundation type that is allowed. Often you test two spots on lot about 25' to 35' deep, and is required by the building department. |
Soil Testing by Engineer | ||
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house. |
Demo Existing Home: -Under 2,000 Sq Ft | ||
Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house. |
Demo Existing Home: - Over 2,000 Sq Ft | ||
Not always required (Soil Report to confirm) but based off your info added this is a fair range that includes pilings every 12' at footer, 35' deep, cut off and remove exposed with monitored, certified and vibration analyses |
Foundation Pilings | ||
Based off your info above this is the price extra to replace Laminate shingles with Aluminum .032 hidden screw standing seam metal roof. |
Laminate Shingle to Metal Roof | ||
Based on your info, Replace Post and Picket aluminum railing with Aluminum post and horizontal Stainless Steel Cable railing. |
Reg. Railing upgraded to S.S. Cable | ||
Based on your driveway data, replace 4" thick concrete with Pavers & 3" base material. |
Driveway upgrade to Pavers | ||
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light. |
Elevator: - 2 stops (1st & 2nd Flr) | ||
Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light. |
Elevator: - 3 stops (1,2 & 3rd Flr) | ||
Based on your data, Credit stucco on CMU and replaced with 6" cement siding. |
Stucco upgraded to cement siding: -1st floor | ||
Based on your data, Credit stucco on wood and replaced with 6" cement siding. |
Stucco upgraded to cement siding: -2nd Floor | ||
Based on your data, Credit stucco on wood and replaced with 6" cement siding. |
Stucco upgraded to cement siding: - 3rd Floor | ||
All Gast Homes houses have CMU concrete block on first floor standard. |
Exterior Walls CMU Concrete Block: -1st floor | ||
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 2nd flr, trusses, bolts , 1x2 furring, insulation, stucco. |
Exterior Walls CMU Concrete Block: -2nd Floor | ||
Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 3rd flr, trusses, bolts , 1x2 furring, insulation, stucco. |
Exterior Walls CMU Concrete Block: - 3rd Floor | ||
Replace CMU with ICF solid concrete core, rebar, double sided stucco, labor |
Exterior Walls ICF Solid Concrete: -1st floor | ||
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor |
Exterior Walls ICF Solid Concrete: -2nd Floor | ||
Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor |
Exterior Walls ICF Solid Concrete: - 3rd Floor |