Estimator #1 1st Floor Enter in Square Feet which is Length X Width total area on 1st floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. Living / Condition Square Feet Enter in Square feet which is Length x Width of area that is not finished on 1st floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. Unconditioned Square Feet Enter square feet which is width x length for covered porch areas on 1st floor. These areas often are open on three sides. Includes footer, porch slab, post, heta straps, soffit board ceiling, floor truss above, labor Covered porch Square Feet Enter in feet the total distance of all exterior walls on 1st floor including any exterior stair walls, house walls, garage wall, etc. Note: that the ceiling height below must be filled out to be correct. Linear feet of exterior wall Enter in Feet the height from floor to ceiling on 1st floor. For multiple heights just average together. Note: The number is used in the above exterior wall calculations. Includes CMU Block, Stucco Ceiling height in Feet 2nd Floor Enter in Square Feet which is Length X Width total area on 2nd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 2nd floor exist then leave this section with blanks or zero's. Living / Condition Square Feet Enter in Square feet which is Length x Width of area that is not finished on 2nd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. Unconditioned Square Feet Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above. Porch Square Feet Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco Linear feet of exterior wall Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor Ceiling height in Feet 3rd Floor Enter in Square Feet which is Length X Width total area on 3rd floor that is considered a finished area. Consider Condition space the area that is normally heated and cooled. If no 3rd floor exist then leave this section with blanks or zero's. Living / Condition Square Feet Enter in Square feet which is Length x Width of area that is not finished on 3rd floor. Examples: Garage, storage, Outside living areas. Consider Unconditioned areas that are not heated or cooled. Unconditioned Square Feet Enter square feet which is width x length for covered porch areas on 2nd floor. These areas often are open on three sides. Includes Floor truss, plywood, waterproof membrane and finish, soffit board above. Porch Square Feet Enter in feet the total distance of all exterior walls on 2nd floor includes, truss ribbon bracing, flat straps, top / bottom plates, truss band zip wall sheathing, insulation and stucco Linear feet of exterior wall Enter in Feet the height from floor to ceiling on 2nd floor. For multiple heights just average together. Includes Exterior wall studs, Drywall, Insulation, Stucco, Zip Board, Labor Ceiling height in Feet Exterior Windows & Doors Don't just count the openings, multiple windows fit together and you count each window. Included Impact rated windows, Mull bars, Screws, Header, metal straps, cripple studs, corner bead, Labor. Total number of Windows Includes, Impact rated door slab swing doors, paint, door knob, stop, header, door frame and all labor. Total number of Swing Doors (Solid) Covers, Impact rated glass swing doors, paint, door knob hardware, door frame and all labor. Total number of Swing Doors (Glass) Sidelight is the small narrow window that mounts to the side of a swing door. includes impact rated window, header and labor, paint. Total number of Door Sidelights These are the 8' tall glass sliding door panel. At each opening you will have 2 or more panels, count. Includes Impact rated panels, Labor, Hardware and Header. Total number of Patio Slider Panels Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor. Overhead Garage Door 16x7 Includes Wind rated aluminum door, with track, Garage door opener, concrete header above door, Outlet, 2x6 treated plates, L-bolts, trim seals on exterior and all labor. Overhead Garage Door 8x7 Cabinets & Plumbing Includes lower and upper cabinets, Granite Countertop, Handles, GFCI outlets, labor. Kitchen Cabinets linear feet Includes Vanity cabinets, Granite Countertop w/ splash, Handles, Mirror, Light fixture, GFCI outlets, labor. Bathroom Cabinets linear feet Includes Stainless Steel under mount sink, Plumbing rough-ins, Sink faucet. Sinks- Kitchen / Bar / Utility Includes China under mount sink, Plumbing Rough-in, Plumbing Fixture, one light fixture wired. Sinks- Bathroom Only Includes Plumbing rough-in, Toilet fixture, Exhaust fan, Switch, labor. Toilets Includes tile, plumbing rough-in, Shower pan, water proofing, plumbing fixtures, Shower Rod. Showers Includes tile, plumbing rough-in, tub, plumbing fixtures, Shower Rod, labor. Tub / Shower Combo Includes, jetted tub, faucets, up size water heater, 220 gfci power, tile splash, Labor. Large Tub Roof / Railing / Other Includes concrete driveway 4" thick, grading, forms, Labor & Materials. Driveway Square Feet Includes aluminum post & Picket railings, labor, material. Railing Linear Feet Includes Trusses, Shingle, 1/2 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor Roof– Sloped Square Feet Includes Trusses, TPO, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor Roof—Flat Square Feet Includes Trusses 16" O.C., Polyurethane coating, 3/4 Sheathing, 2x4, 2x6, Soffit, Insulation, Labor Roof—Sundeck Square Feet Extra Field, if used quantity equals $1 and details explained in Notes. Other Price estimator To 8/5/2024https://gasthomes.com/Custom plan This pricing estimator is only a rough range based on averages that a normal house could be built, the more accurate you enter data the more accurate the price will be. Disclaimer The goal was to put numbers together that would build a quality complete house except for the building lot, exterior pool, landscape and appliances. Not Included Notes Print PDF Additional Upgrades & Add-on Options Impact fees are charged by cities to help cover the load on the cities infrastructure when a house is added. Each cities fees are different, and if a past house was on the lot the fees are often highly reduced or even zero. Impact Fees Soil testing is often done before you buy your lot to confirm a possible foundation type that is allowed. Often you test two spots on lot about 25' to 35' deep, and is required by the building department. Soil Testing by Engineer Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house. Demo Existing Home: -Under 2,000 Sq Ft Covers Demo Permit, cap sewer & water. Silt fence area, demo and remove house. Demo Existing Home: - Over 2,000 Sq Ft Not always required (Soil Report to confirm) but based off your info added this is a fair range that includes pilings every 12' at footer, 35' deep, cut off and remove exposed with monitored, certified and vibration analyses Foundation Pilings Based off your info above this is the price extra to replace Laminate shingles with Aluminum .032 hidden screw standing seam metal roof. Laminate Shingle to Metal Roof Based on your info, Replace Post and Picket aluminum railing with Aluminum post and horizontal Stainless Steel Cable railing. Reg. Railing upgraded to S.S. Cable Based on your driveway data, replace 4" thick concrete with Pavers & 3" base material. Driveway upgrade to Pavers Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light. Elevator: - 2 stops (1st & 2nd Flr) Optional elevator installed. Includes Elevator pit with footers, Extra support wood for rails, elevator cart, Special swing doors, 220 volt circuit, 110 volt outlet, light. Elevator: - 3 stops (1,2 & 3rd Flr) Based on your data, Credit stucco on CMU and replaced with 6" cement siding. Stucco upgraded to cement siding: -1st floor Based on your data, Credit stucco on wood and replaced with 6" cement siding. Stucco upgraded to cement siding: -2nd Floor Based on your data, Credit stucco on wood and replaced with 6" cement siding. Stucco upgraded to cement siding: - 3rd Floor All Gast Homes houses have CMU concrete block on first floor standard. Exterior Walls CMU Concrete Block: -1st floor Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 2nd flr, trusses, bolts , 1x2 furring, insulation, stucco. Exterior Walls CMU Concrete Block: -2nd Floor Includes Credits for 2x6 wood wall, plywood, insulation, stucco. Added cost for CMU Block, Ledger @ 3rd flr, trusses, bolts , 1x2 furring, insulation, stucco. Exterior Walls CMU Concrete Block: - 3rd Floor Replace CMU with ICF solid concrete core, rebar, double sided stucco, labor Exterior Walls ICF Solid Concrete: -1st floor Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor Exterior Walls ICF Solid Concrete: -2nd Floor Replace 2x6 wood wall, insulation, plywood with ICF solid concrete core, ledger, connectors, rebar, labor Exterior Walls ICF Solid Concrete: - 3rd Floor