Waterfront owners often measure permitting from the application date.
The real timeline begins earlier, with survey, geotechnical work, flood and elevation strategy, architecture, structural engineering, civil coordination, marine conditions, utilities, and document alignment.
An incomplete or internally inconsistent package can extend review far more than the formal submission period.
The correct answer depends on the property, jurisdiction, structure, waterfront, ownership horizon, and verified facts—not on a generic rule or isolated cost number.